Step 1 install the support posts.
Building a pool deck step by step.
6 steps to build an above ground pool deck measurement and preparation building a pool deck is the kind of activity that should be conformed to your local building.
The building inspector said i was getting the fancy stuff.
The critical steps here are a good foundation.
Align the edge of the first length of decking boards with the outside edge of the beam.
As the building inspector said this is the stuff they put in the fancy houses.
Decking is again a straight forward easy part of the process that decks a long time.
Posts installation previously marked places will equate you to keep in mind when the post should be installed.
Once the second pair of posts is cut to size set them into the piers and place a floor joist frame on top.
It is important to remember when cutting posts to size that each one should be set at least two feet below grade.
As you install the decking boards perpendicular to the joists drive two fasteners through each board into the center of.
Framing the floor the floor framing around the pool consists of 18 trapezoidal floor joist frames 4 sided.
You heard it here first.
Deck screws down at an angle through the frame and into the tops of the posts photo 4.
Refer to the plan or use one of the assembled floor joist frames to position the pier blocks.