Working time 3 hrs.
Building with metal studs framing.
Framing with metal studs is generally a simple quick and affordable process.
To frame a wall with metal studs expect to spend about 2 to 3 hours for a 12 foot wall.
Wood burns metal does not.
Metal cut off saw fasteners a hammer drill screw gun chalk box level laser level or plumb bob 1 x research source clampsstep 2 determine the number of steel studs needed.
The best technique for framing steel walls is to first fasten the floor and ceiling tracks and then install the studs one at a time.
Temporary structures and partitions are usually constructed with this kind of material.
Metal framing studs are used to support a non load bearing wall.
We have seen many diy ers being reluctant to framing with metal studs as this technology is rather new for the vast majority of people as compared to wood studs.
You can typically get the best equipment for this at local construction rental stores.
Step 1 rent or purchase the right tools.
You should typically allow for 1 stud per every 12 inches 300 mm of linear wall space.
3 625 in w x 120 in l x 1 25 in d prostud 3 5 8 20 ga galvanized steel metal stud.
How to build a metal stud wall.
Metal framing next to an outside wall ie the foundation wall in a basement will transfer the cold.
Cut the flanges on the sides of the metal framing track with a metal stud cutter and bend down the inner web to create a fastening surface.
You ll need to plan the wall location and measure the height of the wall in several spots before you begin.
Working with steel studs requires a few special tools.
This kind of wall is commonly found at home depot or lowe s and is often referred to as light gauge metal framing.
Purchase steel plates also.
Beyond the obvious comfort issue this may cause condensation on the walls in the stud locations.
A wall built with metal studs is virtually fireproof.